Zurich 1
- 1,900m2 built space
- 4,150m2 total space available
- Density 1,200W/m2
- Carrier neutral
- Tier 3
Madrid 1
- 1,200 m2 built space
- 2,300 m2 total space available
- Density 1,000 W/m2
- Carrier neutral
- Tier 3
Lisbon 1
- 190m2 built space
- 435m2 total space available
- Density 1,000W/m2
- Carrier neutral
- Tier 2
Hamburg 1
- 535m2 built space
- 2,535m2 total space available
- Density 1,250W/m2
- Carrier neutral
- Tier 3
Paris 1
- 385m2 built space
- 850m2 total space available
- Density 1,250W/m2
- Tier 3
- Carrier neutral
Paris 2
- 1,000m2 built space
- 4,850m2 total space available
- Density 1,500W/m2
- Tier 3
- Carrier neutral
- Space available
Brussels 1
- 3,300m2 built space
- Density 1,000W/m2
- Building two: 1,250W/m2
- Tier 3
- Carrier neutral
London 2
- 3,733m2 built space
- 4,883m2 total space available
- Density 1,250W/m2
- Tier 3
- Carrier neutral
London 3
- 12,500m2 of technical space
- Powered by 33MVA
- Tier 3
- Design PUE 1.21
- Located North of London
- Carrier neutral
- Space available
Netherlands 3
- 10,000m2 of built space
- 39,000m2 total space available
- Powered by 32 MVA
- Carrier neutral
- Tier 3
- Design PUE 1.21
- Strategically located between four major cities
- Space available
Copenhagen 1
- 760m2 of build space
- Total available space 1,810 m2
- Density 1,000W/m2
- Carrier neutral
- Tier 3
Click on the map to find out more information about each of our data centres.